View as

Electrical Meters & Monitoring

An electricity sub-meter measures the power used by one unit, tenant or circuit downstream of the main supply meter, so that an occupant's use can be billed or monitored separately. This range holds four Metro digital prepaid meters for single-phase and three-phase supplies, each rated IP54, MID certified and using PayPoint vending, and a Haydon inline DC volt and amp meter for checking low-voltage equipment.

Choosing Electrical Meters & Monitoring

The choice between the Metro meters comes down to supply type, current and how the occupant pays.

Single phase or three phase

The MET001 and MET004 are single-phase meters rated 80A and the MET200 is single phase at 60A. The MET003 is a three-phase prepaid meter rated 100A for workshops, plant and larger units.

How credit is added

All four Metro meters use PayPoint vending, so an occupant buys a power code through PayPoint and enters it on the meter. The MET004 also has a remote keypad, which lets the meter sit in a cupboard or riser while the occupant enters credit from a more convenient position.

Where the meter goes

All four Metro meters are rated IP54 against dust and splashing water, suitable for plant rooms, outbuildings and communal cupboards.

ModelSupplyCurrentNotes
Metro MET001Single phase80AMID, PayPoint
Metro MET004Single phase80AMID, PayPoint, remote keypad
Metro MET200Single phase60AMID, PayPoint
Metro MET003Three phase100AMID, PayPoint
Haydon HAY-DC-MDC, 5-35 V7 AInline volt and amp meter

Standards & compliance

MID certification means a meter is approved under the Measuring Instruments Directive, which is the approval expected of a meter whose readings are used to bill. Check the MID status on the product page if the meter will be used for recharging electricity.

Low-voltage monitoring

The Haydon HAY-DC-M reads volts and amps inline on 5-35 V DC circuits up to 7 A through a 2.1 mm DC socket and plug, for checking the power supply to a CCTV camera on the bench or in a cabinet.

Brands we stock in Electrical Meters & Monitoring

Haydon and Metro.

Metro supplies the four prepaid meters and Haydon the DC meter.

Related categories

For testing circuits see electrical test equipment, and for the low-voltage supplies the Haydon meter checks, DC power supplies.

Frequently asked questions

What is a prepaid electricity sub-meter used for?

It lets a landlord or site owner charge an occupant for the electricity their unit uses, with the occupant paying in advance. The Metro prepaid meters here are fitted after the main supply meter on the circuit feeding a rental unit, a workshop or a private EV charger.

How does an occupant add credit to a Metro prepaid meter?

On all four Metro meters, the MET001, MET003, MET004 and MET200, a power code is bought through PayPoint vending and entered on the meter. The MET004 also has a wired remote keypad, so credit can be entered away from the meter itself, which can then sit in a cupboard or riser.

Which Metro meter suits a three-phase supply?

The MET003, a digital prepaid three-phase electricity meter rated 100A and IP54. The MET001, MET004 and MET200 are single-phase meters rated 80A, 80A and 60A, so choose by the supply type and the maximum current of the circuit being metered, not by the rating of the main supply.

What does MID certified mean on an electricity meter?

It means the meter is approved under the Measuring Instruments Directive, the approval expected of a meter whose readings are used for billing. All four Metro meters here, the MET001, MET003, MET004 and MET200, are MID certified; the MET001 and MET200 also state it in their titles.

Can these meters be installed outside?

The Metro MET001, MET003, MET004 and MET200 are rated IP54, which protects against dust and splashing water, so they suit plant rooms, outbuildings and communal cupboards. For a fully exposed wall, fit the meter inside a suitable weatherproof enclosure rather than directly in the weather.

How do I check the voltage and current of a DC power supply?

Fit the Haydon HAY-DC-M inline DC volt and amp meter between the supply and the load. It reads 5-35 V circuits up to 7 A through a 2.1 mm DC socket and plug, and its description names CCTV cameras as the use it especially suits, on a bench or in a cabinet.

What is the difference between a sub-meter and the main electricity meter?

The main supply meter measures everything a property takes from the grid; a sub-meter sits after it and measures one circuit, such as the supply to a flat or workshop. The Metro MET001, MET004 and MET200 here are single-phase prepaid sub-meters at 80A, 80A and 60A, and the MET003 is three phase at 100A.

What current rating do the Metro meters have?

The Metro MET001 and MET004 are rated 80A and the MET200 60A, all single phase, and the MET003 three-phase meter is rated 100A. Choose a rating at or above the maximum current of the circuit the meter will measure, not the rating of the main supply.

Why buy from West Midlands Electrics

  • Established 1975
  • Birmingham trade counter
  • UK-only supply

Written by the West Midlands Electrics technical team

Updated